PASSANTE FERROVIARIO - PORTA VENEZIA STATION (Milano - Italy)
CLADDING OF 32 BARREL VAULT FLOOR SPANS, CONNECTION WALLS AND TIE-RODS
Client: MUCAFER
Designer: MILANO UNDERGROUND
Executive plan: PROMETAL SPA
Installer: COIVER CONTRACT e TECNOLOGIE INDUSTRIALI
Size of job: 10.200 SQ.M.
Material: PUNCHED ANODIZED ALUMINIUM
Designer: MILANO UNDERGROUND
Executive plan: PROMETAL SPA
Installer: COIVER CONTRACT e TECNOLOGIE INDUSTRIALI
Size of job: 10.200 SQ.M.
Material: PUNCHED ANODIZED ALUMINIUM
Overall work involves cladding of 32 barrel-vault floor spans, connection walls with the walk-over flooring and tie-rods to support the cement beams of the vault.
The false ceiling was designed with calendared and punghed panels in anodised aluminium secured to the vault with special extruded aluminium profiles.
All machining operations, except for the supply of the extruded profiles, were performed in our own factory according to shop drawings developed by our Technical Office.
The false ceiling was designed with calendared and punghed panels in anodised aluminium secured to the vault with special extruded aluminium profiles.
All machining operations, except for the supply of the extruded profiles, were performed in our own factory according to shop drawings developed by our Technical Office.